A safety submission wins marks when it answers the tender’s own residual-risk list and criteria with verifiable evidence, rather than restating general policy. Since 1 April 2024, public-sector construction tenders above S$1 million carry a minimum 5% weightage for safety-related criteria, so a weak safety section can cost a bidder a contract that its price would otherwise have won. Our consultancy prepares contractors for exactly this: the certifications, audits and Design for Safety records that a tender evaluator can check.
TL;DR
- Safety carries a minimum of 5% of the overall score in public-sector construction tenders above S$1 million, and 15% of the Quality weightage (or 5% of the overall score, whichever is higher) under the Price Quality Method.
- A temporary disqualification applies if you entered MOM’s Business Under Surveillance programme within 3 months of tender closing, or hold 25 or more demerit points.
- Evaluators look beyond track record: WSH technology proposals, risk assessments, accreditations and your answers to the tender’s residual-risk list all earn marks.
- Certifications (bizSAFE, ISO 45001), ConSASS audits and Design for Safety records are most useful when they are current and ready before the tender is called.
Table of Contents
- How safety is scored in a Singapore tender
- The safety disqualification check comes first
- What evaluators actually mark
- The documents a safety submission usually contains
- Certifications that carry weight
- Design for Safety in the tender
- Safety as part of the quality score
- A preparation sequence that works
- Where we can take the work off your hands
- Our perspective
- FAQ
- Sources
How safety is scored in a Singapore tender
Safety is no longer a pass-or-fail gate that you clear and forget. It is a scored component, and the weighting depends on how the contract is evaluated.
MOM’s circular of 2 February 2024 set the rules for tenders called on or after 1 April 2024. The headline figures from MOM’s requirements page for public-sector construction are:
- Tenders above S$1 million: a minimum of 5% of the overall score goes to safety-related criteria.
- Price Quality Method (PQM) contracts: 15% of the Quality weightage or 5% of the overall PQM score, whichever is higher. This replaced an earlier minimum of 3% of the overall score for tenders of at least S$3 million.
- Non-PQM tenders above S$1 million: a 5% minimum now applies in the CW01, CW02, ME and CR workheads.
The Price Quality Method is the evaluation approach in which price and quality are weighted together instead of the lowest bid winning automatically. BCA’s PQM framework, effective from 1 November 2024 and updated on 26 January 2026, sets Price at 40 to 60% and Quality at 60 to 40% for building tenders (CW01), and Price at 50 to 70% and Quality at 50 to 30% for civil engineering tenders (CW02). Quality attributes can include safety performance drawn from MOM’s Safety Demerit Point System, past performance, track record, key personnel experience and project-specific proposals.
A practical consequence: in a tender where Quality is 50% and safety must be at least 15% of that, safety is worth at least 7.5 points of the overall score. In a close price contest, that is often the margin.
Why safety differs from agency to agency
Private developers and utilities write their own criteria. SP Group’s Safety Performance Criteria policy sets eligibility thresholds of no fatality in the past 12 months and fewer than 5 MOM demerit points. Price-only tenders are scored 90% on price and 10% on safety performance, while CPMS tenders are scored 85% on quality and price combined and 15% on safety. The policy was enhanced from April 2026 to include workplace fatalities and demerit points. Always read the tender’s own evaluation matrix first. The national minimums are a floor, not a description of your particular bid.
The safety disqualification check comes first
Before evaluators score anything, they check whether you may bid at all. Under MOM’s Safety Disqualification (SDQ) criteria, a construction company is temporarily disqualified from public-sector tenders if either of these applies:
- It entered MOM’s Business Under Surveillance (BUS) programme within 3 months before the tender closing date or Letter of Award date, or after closing but before award.
- It has accumulated 25 or more demerit points under MOM’s Demerit Point System at the closing or award date, or between the two.
Since 1 April 2024, the framework covers all public construction and construction-related tenders. For project sums of S$90,000 to S$1 million it covers main contractors only. Above S$1 million it covers main contractors and subcontractors at every level. The main contractor must rectify a non-compliant subcontractor, for instance by removing a disqualified one, and can use MOM’s CheckSAFE portal to verify them.
Two habits follow from this:
- Check your own status and your subcontractors’ status on CheckSAFE before you commit bid resources, and again before the tender closes.
- Treat demerit points as a pipeline risk. A site incident in the weeks before closing can change your eligibility, so a pre-bid WSH audit of live sites is cheap insurance. Our WSH Audit and Inspection service is built for this kind of review.
What evaluators actually mark
MOM’s Annex A implementation guide lists suggested safety criteria beyond the demerit point system. They give a clear picture of what a strong submission contains:
| Criterion | What it rewards | Evidence to prepare |
|---|---|---|
| BUS status | Clean standing with MOM | CheckSAFE record |
| Safety track record | Low past demerit points, assessed over 2 years | Demerit history, incident statistics |
| WSH technology | Tools that monitor or reduce risk | Named technologies, deployment plan |
| Safety proposals | Preliminary risk assessments with control measures | Project-specific risk register |
| Accreditations and awards | Third-party recognition | bizSAFE certificates, WSH Awards |
MOM’s stated rationale is to differentiate tenderers on safety further, and to encourage contractors to propose safer construction methods or WSH technologies for risk monitoring. A bidder that merely lists a policy has no answer to that. A bidder that proposes a safer method and shows how it will be monitored does.
Technology specified in the tender
For public-sector projects of S$3 million or more, tender documents must specify mature WSH technology, including an Electronic Permit-To-Work (ePTW) system and Vehicular Safety Technology (VST), according to MOM’s 2024 circular. Your submission should show where these sit in your site workflow, who operates them and what records they generate. For projects of S$50 million or more, the same circular describes the WSH Bonus Scheme, with the scheme specification placed in the tender document and the main contractor allocating part of the bonus to reward on-site workers.
The documents a safety submission usually contains
The Workplace Safety and Health Council’s procurement guidelines say tender specifications should include evaluation criteria, scoring metrics and a list of residual risks that bidders must address. Residual risks are the hazards that remain after design has eliminated or reduced what it can, so the contractor has to control them in construction. The same guidelines advise that a response covers:
- A site-specific hazard reporting system.
- Roles and responsibilities for hazard prevention.
- The WSH legislation and standards that apply.
- High-risk hazards and their control measures.
- Specifications for certified equipment.
- Proposed construction methods and safe work procedures.
- Physical and administrative controls, such as lifting plans, fall prevention and fire protection.
The guidelines also name lagging indicators evaluators may use: past WSH performance (verifiable through CheckSAFE), experience with similar projects and work injury compensation claims.
Private developers often go further. The WSHC’s sample criteria include a gap analysis of the contractor’s safety standards against the developer’s requirements, visible leadership commitment, resources committed to WSH, management of high-risk work, systems for monitoring safety KPIs, incident reporting and emergency response plans, worker welfare and WSH culture initiatives.
Turn the residual-risk list into your table of contents
The most common weakness we see described in evaluator guidance is a generic submission that ignores the tender’s specific risks. Structure your document so that each listed residual risk has its own response: the hazard, the control hierarchy applied, the method statement reference, the responsible person and the monitoring method. An evaluator scoring against a matrix can then find every mark quickly.
Benchmark the draft against the scoring metrics line by line. For larger or complex projects, the guidelines also advise preparing for a structured interview, fronted by senior management. Someone with authority over resources should be able to explain the submission, not only the safety officer who wrote it.
Certifications that carry weight
bizSAFE
bizSAFE is the Workplace Safety and Health Council’s five-level programme, and Level 3 requires a company to develop and implement a Risk Management Plan that is independently audited. Which level or equivalent your bid needs depends on your BCA registration grade and workhead, and on the tender itself. Read the tender conditions and your registration requirements together before you plan the timeline, since the audit and implementation cannot be compressed at the last minute. MOM’s Annex A also lists bizSAFE awards among the accreditations that may be scored. Our guides on bizSAFE Level 3 for subcontractors and on ISO 45001 versus bizSAFE set out the choice in more detail, and our bizSAFE Level 3, 4 and Star service supports companies through the process.
ISO 45001
ISO 45001 is the international standard for occupational health and safety management systems. For some registration grades it can stand in for bizSAFE Level 3, and for firms bidding across borders or for multinational clients it is a recognised signal of a systematic approach. If you already operate a management system, an ISO certification built on it gives the submission a documented backbone that evaluators can trace.
ConSASS
The Construction Safety Audit Scoring System (ConSASS) scores a site’s safety and health management system. MOM’s ConSASS user guide (Version 4.0, effective 18 May 2022) requires worksites with a contract sum of S$30 million or more to have the system audited by an approved independent external auditing organisation at least once every six months. It also notes that ConSASS lets developers and clients compare contractors’ WSH risk-management capabilities before awarding contracts. A strong, recent ConSASS result is therefore both a compliance record and a comparative advantage. Our ConSASS service and guide to preparing ConSASS documentation correctly cover how the evidence is assembled.
Design for Safety in the tender
Design for Safety (DfS) means identifying and reducing hazards at the design stage, before they become site risks. Under the WSH (Design for Safety) Regulations 2015, a Design for Safety Professional (DfSP) who has completed the prescribed course convenes DfS Review Meetings and maintains a DfS Register of meeting minutes and Design Risk Assessment Forms. The REDAS Good Practice Guide (September 2025) recommends including the register’s List of Residual Risks in tender specifications, and notes that tenders may ask for a contractor DfS focal point who has attended the DfS Appreciation Course or higher.
For a bidder this means two things. First, read the residual-risk list as a brief for your construction methodology. Second, name your DfS focal point and show their training. The guide also recommends that the DfSP is onboard no later than the end of planning and design, because earlier review removes risk at source more effectively. Developers who need that role filled can look at our Design for Safety Professional service.
Safety as part of the quality score
Because safety sits inside the Quality attribute of a PQM tender, it competes for marks with methodology, track record and key personnel. Bidders that treat the safety section as a separate appendix tend to lose coherence: the method statement says one thing and the safety plan another. Consistency across the whole technical submission is itself a quality signal. The same discipline applies to outsourced design work, where a quality assurance checklist for outsourced engineering shows how review steps keep documents aligned before they are issued. Apply that logic to your tender pack: one reviewer should check that safety commitments, programme assumptions and resourcing match.
A preparation sequence that works
- Read the evaluation matrix on day one. Note the safety weightage, scoring metrics, residual-risk list and any specified technologies.
- Verify eligibility. Check your BUS status and demerit points on CheckSAFE, and those of every proposed subcontractor.
- Confirm your certificates. Check that bizSAFE or ISO 45001 meets the tender and registration requirements and is within its validity period.
- Collect lagging evidence. Assemble two years of safety statistics, similar-project experience and claims history.
- Draft risk-by-risk responses. Use the residual-risk list as the structure, with control measures, methods and responsible persons.
- Add a technology proposal. Describe ePTW, VST or other WSH technology, with deployment and monitoring detail.
- Prepare the interview. Brief the senior manager who will present, and rehearse questions on resources and leadership.
- Run a final consistency check. Compare safety commitments against programme, manpower and cost assumptions.
For firms that do not have spare safety staff during a bid, EHS manpower outsourcing can supply capacity, and our EHS Advisory and Documentation service covers the written system. Our own tender-focused guides, Construction Tender Safety Requirements: 2026 Preparation Guide and BCA safety tender requirements, go through the process in more depth.
Where we can take the work off your hands
Mosaic Ecoconstruction Solutions provides Quality, Environment and Safety consultancy and training to the construction sector, with more than 20 years of experience. Our services include bizSAFE and ISO certification support, WSH audits, ConSASS, Design for Safety advisory, EHS documentation and manpower outsourcing, with continuing support after an engagement. Contractors preparing for a tender can start with our consultancy service, or contact us through the Mosaic website.
Our perspective
Tender evaluators have moved from asking whether a contractor holds a certificate to asking whether the contractor can prove how it controls risk on this particular project. That shift favors firms whose safety system is built before the tender, not assembled during it.
In our experience as a consultancy serving construction companies, the strongest submissions share one trait: certification, audit results, Design for Safety records and site procedures all tell the same story. A bizSAFE Level 3 certificate, an ISO 45001 system or a ConSASS audit is most valuable when the documents behind it are the documents the project team actually uses.
That is why we work across certification, audit, DfS and documentation together. A contractor that treats them as separate projects pays for the same work several times. A contractor that integrates them answers every evaluation criterion from one coherent system, and keeps that system working after the award.
Aman
FAQ
What is the minimum safety weightage in a Singapore public-sector tender?
For construction tenders above S$1 million, the minimum is 5% of the overall score. Under PQM, it is 15% of the Quality weightage or 5% of the overall score, whichever is higher. The rules apply to tenders called on or after 1 April 2024.
Can a company be barred from bidding because of safety performance?
Yes. Under the Safety Disqualification Framework, a company that entered the BUS programme within 3 months before tender closing or award, or that holds 25 or more demerit points, is temporarily disqualified from public-sector tenders. Check your status on MOM’s CheckSAFE portal before bidding.
Does my subcontractor’s safety record affect my bid?
It can. For project sums above S$1 million, the SDQ Framework covers main contractors and subcontractors at all levels, and the main contractor must rectify non-compliance, for example by removing a disqualified subcontractor.
Do I need ISO 45001 as well as bizSAFE?
That depends on your BCA registration grade and the tender conditions. ISO 45001 can serve as an alternative to bizSAFE Level 3 for certain grades, and either may earn marks as an accreditation. Read the tender and your registration requirements before choosing.
What should a residual-risk response include?
For each listed residual risk, state the hazard, the control measures, the construction method or safe work procedure, the person responsible and how the control will be monitored. Keep the order identical to the tender’s list so evaluators can score it quickly.
Sources
- MOM: WSH requirements in public-sector construction and construction-related projects
- BCA: Price Quality Method (PQM) Framework
- SP Group: Safety Performance Criteria
- MOM: Safety disqualification criteria for public-sector construction
- MOM: Annex A summary and implementation guide (2024)
- MOM: Harmonised WSH requirements across public-sector construction (circular, 2024)
- WSH Council: WSH Guidelines on procurement in the construction industry
- MOM: ConSASS user guide
- REDAS: DfS Good Practice Guide




